Loading data. Please wait
Low-voltage electrical installations. Requirements (together with the standard NF C 15-100, May 1991 and amendment 1 remains applicable to those constructions for which the date of filing of the construction permit or, failing this, date of preliminary declaration of construction, or failing this, the date of signature of the contract, or again, failing this, the date of acknowledgement of receipt of order, is prior to June 1, 2003).
Số trang: 44
Ngày phát hành: 1995-12-01